Scaffold Tools
- 10
- 15
- 18
- 20
- 25
- 30
- 50
- Featured
- Most relevant
- Best selling
- Alphabetically, A-Z
- Alphabetically, Z-A
- Price, low to high
- Price, high to low
- Date, old to new
- Date, new to old
Sort by:
- Featured
- Most relevant
- Best selling
- Alphabetically, A-Z
- Alphabetically, Z-A
- Price, low to high
- Price, high to low
- Date, old to new
- Date, new to old
-
Vendor:Turboscaffolding
Half Coupler Spigot Galvanised
- $21.00
-
Was Price
- Sale Price $21.00
- Unit price
- / per
(Ex. GST) -
Vendor:Turboscaffolding
T Lite ALUMINIUM Topper thick – 4.0mm
- $15.75
-
Was Price
- Sale Price $15.75
- Unit price
- / per
(Ex. GST) -
Vendor:Turboscaffolding
V Clusters for Standards
V pressings (V clusters) are steel components used in the fabrication of specialised or custom scaffold components. They are typically welded onto scaffold standards to create connection points for additional tubes or fittings where standard scaffold parts cannot be used. Commonly used in custom...- $2.12
-
Was Price
- Sale Price $2.12
- Unit price
- / per
(Ex. GST) -
Vendor:Turboscaffolding
Banana End
Banana ends are replacement fittings used to repair damaged ends on scaffold ledgers, transoms, and other compatible components. They are commonly welded onto the end of scaffold tubes to restore the connection point, allowing the component to be reused instead of replaced. Manufactured from...- $2.00
-
Was Price
- Sale Price $2.00
- Unit price
- / per
(Ex. GST) -
Vendor:Turboscaffolding
Ledger End Assembly
Ledger end assemblies are replacement fittings used to repair or replace damaged or unusable ends on scaffold ledgers. They restore the connection point, allowing the ledger to be securely fixed to scaffold standards within a Kwikstage system. Each assembly comes complete with a wedge...- $3.59
-
Was Price
- Sale Price $3.59
- Unit price
- / per
(Ex. GST) -
Vendor:Turboscaffolding
Transom End Assembly
Transom end assemblies are replacement fittings used to repair or replace damaged or unusable ends on scaffold transoms. They restore the connection point, allowing the transom to be securely fixed to scaffold standards within a Kwikstage scaffold system. Each assembly is supplied complete with...- $4.70
-
Was Price
- Sale Price $4.70
- Unit price
- / per
(Ex. GST) -
Vendor:Turboscaffolding
Brace Ends
Brace end assemblies are replacement fittings used to repair or replace damaged or unusable ends on scaffold braces. They restore the connection point, allowing the brace to be securely fixed to scaffold standards within a Kwikstage scaffold system. Manufactured from durable steel, brace end...- $5.24
-
Was Price
- Sale Price $5.24
- Unit price
- / per
(Ex. GST) -
Vendor:Turboscaffolding
Plank Caps Ends
Plank cap ends are used to finish and protect the ends of scaffold planks. They are commonly fitted when plank ends become damaged, helping restore the plank and extend its usable life. Plank caps also help cover sharp edges, reducing the risk of injury...- $3.40
-
Was Price
- Sale Price $3.40
- Unit price
- / per
(Ex. GST) -
Vendor:Turboscaffolding
Pallet Feet
Pallet or stillage feet are used to support pallets and stillages, helping keep them elevated off the ground. This improves stability while also protecting stored materials from moisture, dirt, and damage when placed on warehouse or job site surfaces. Manufactured from durable steel, these...- $5.00
-
Was Price
- Sale Price $5.00
- Unit price
- / per
(Ex. GST) -
Vendor:Turboscaffolding
Spigot for Standards
Spigots are used to connect two scaffold standards together, allowing vertical extensions within a scaffold structure. They are inserted into the ends of the standards to create a secure alignment between the two components. Once fitted, the connection is typically secured using a hinge...- $10.24
-
Was Price
- Sale Price $10.24
- Unit price
- / per
(Ex. GST) -
Vendor:Turboscaffolding
Wedge
Scaffold wedges are used in Kwikstage scaffold systems to secure ledgers and transoms to scaffold standards. They are driven into the wedge head to lock the connection firmly in place. Replacement wedges are commonly used when existing wedges become damaged, worn, or lost during...- $2.86
-
Was Price
- Sale Price $2.86
- Unit price
- / per
(Ex. GST) -
Vendor:Turboscaffolding
Scaffold Belt set with Frogs and Tools
The Scaffold Belt Set with Frogs and Tools is designed to keep essential scaffolding tools securely organised and easily accessible while working at height. The heavy-duty belt includes multiple frogs and holders to carry commonly used tools such as podger spanners, ratchets, levels, and...- $390.00
-
Was Price
- Sale Price $390.00
- Unit price
- / per
(Ex. GST) -
Vendor:Turboscaffolding
Hammer Forged Turbo
Podger hammers are an essential tool used by scaffolders for assembling and dismantling scaffold structures. The hammer head is designed for driving wedges securely into place, while the pointed podger end allows scaffold components to be aligned quickly and efficiently during installation. Manufactured from...- $48.00
-
Was Price
- Sale Price $48.00
- Unit price
- / per
(Ex. GST) -
Vendor:Turboscaffolding
Ratchet – 21/24mm
The Scaffold Ratchet 21/24mm is a commonly used tool for tightening and loosening scaffold fittings and bolts. Designed specifically for scaffolding work, the dual 21mm and 24mm socket sizes allow scaffolders to work efficiently with standard scaffold connections. Manufactured from high-quality steel, the ratchet...- $53.00
-
Was Price
- Sale Price $53.00
- Unit price
- / per
(Ex. GST) -
Vendor:Turboscaffolding
Spanner turbo – 23.1mm
Scaffold spanners are commonly used tools for tightening and loosening scaffold fittings and bolts during scaffold assembly and dismantling. Designed specifically for scaffolding work, they provide the leverage and strength required for secure scaffold connections. Manufactured to high standards, scaffold spanners are available in...- $48.00
-
Was Price
- Sale Price $48.00
- Unit price
- / per
(Ex. GST)
Scaffold Parts and Tools for Sale
Building a safe and steady scaffold starts long before anyone steps onto the platform. Every tower depends on dozens of small components that work together to keep the structure stable. If even one essential piece goes missing, the entire job can slow down or come to a halt. That’s why having the right scaffold parts and tools on hand is one of the simplest ways to keep your project running smoothly.
Qualified scaffolders rely on specialised tools that are designed for the trade. These aren’t items you can pick up at a general hardware store. They’re built for strength, durability, and accuracy, and they help ensure each part locks into place exactly as it should. When you’re preparing for a job, having a full kit ready saves time and reduces stress on-site.
Why Stocking the Right Parts Matters?
Anyone who has worked with scaffolding knows how frustrating it can be to realise a key part is missing halfway through a build. A small delay can quickly turn into hours of downtime, especially if the missing component is structural. By keeping the most common items in your inventory, you minimise interruptions and keep your team productive from start to finish.
You’ll also prevent unnecessary wear and tear on the structure by replacing older or damaged parts before they cause problems. Fresh components offer better fitment and stability, reducing the chance of movement or misalignment during use.
Common Scaffold Parts You Should Have Ready
Turbo Scaffolding supplies a complete range of scaffold components that help you build with confidence. Some of the frequently used items include:
- V Clusters for Standards for connecting standards with a secure hold
- Banana pieces used for structural support
- Ledger End Assembly designed for firm and accurate positioning
- Transom End Assembly for stable platform support
- Brace Ends that keep the structure steady and aligned
- Plank Caps Ends to protect planks and provide a clean finish
- Pallet Feet for organising and stacking components
- Spigot for Standards for height extension and upright stability
- T Lite Aluminium Topper Thick 4.0 mm for added reinforcement where needed
Each part plays a vital role in ensuring the scaffold performs safely under load.
Tools Every Scaffolder Should Carry
The right tools make scaffold setup smoother and more reliable. Turbo Scaffolding stocks a strong selection of trade tools built for everyday site conditions. These include:
- Wedge for locking scaffold components firmly
- Hammer Forged Turbo built for endurance and precision
- Ratchet 21/24 mm for tightening connections with accuracy
- Spanner Turbo 23.1 mm for secure assembly
- Scaffold Belt Set with Frogs and Tools so every essential item stays within reach during the build
These tools are designed for long-term use and are trusted by scaffolders who work in demanding environments.
Extra Tips for Staying Prepared
If you manage multiple work sites or run a busy schedule, it helps to create a checklist of consumables and frequently used parts. Regularly inspect items for wear and replace them before they become a weak point in the structure. Keep all tools clean and stored correctly so rust, dirt, or weather exposure doesn’t affect performance.
It’s also worth having a few backup components on your truck or in your yard. Items like V clusters, brace ends, and plank caps are small but essential, and having spares ready can save a lot of time during a tight deadline.
Your One Stop for Scaffold Parts and Tools
Turbo Scaffolding supplies a full collection of scaffold parts and tools for both small and large projects. Whether you’re running maintenance work or a major build, you’ll find everything you need to assemble, secure, and complete your next scaffold setup. With reliable parts and trade-grade tools in stock, you can focus on the work ahead without worrying about missing components.
